Quorum Court accountability spelled out

1034

Over the past 3 years, there have been numerous votes that would have altered the trajectory of Carroll County for future generations. Each vote is listed by Date, New Business Wording, Sponsoring Justice of the Peace, and Summary. An Absent is treated by law as a No vote. This gives a factual accounting of how each District JP (1-11) voted.

  1. July 18, 2023 – Bitcoin Ordinance – Sponsor JP Jerry King

An Emergency Ordinance Adopting Certain Rules and Regulations Concerning External Noise Attenuation of Data Centers and to Prevent Noise Disturbance in Carroll County and within its Unincorporated Limits; to Declare an Emergency; and for Other Purposes

Summary: A copy of Boone County Ordinance supposedly protecting Carroll County against Data Centers. Boone County passed this same Bitcoin Ordinance as an Emergency Ordinance the previous month. The State of Arkansas had set a deadline of August 2023

Jack Deaton     YES                Matt Phillips    YES                Roger Hall       YES

Bruce Wright   Absent             Craig Hicks     YES                Jerry King       YES

Harrie Farrow Absent             Kellie Matt      YES                J. Howerton     YES

Hunter Rivett   NO                  F. Pedraza        YES

  1. August 15, 2023 – Emergency Ordinance Adopting Setbacks and Noise Disturbance in Carroll County – Sponsor JP Jack Deaton

An Emergency Ordinance establishing rules for setback lines and Noise disturbances in Carroll County, AR

Summary: An emergency ordinance adopting rules concerning setback lines for turbines and to prevent noise disturbance in Carroll County, AR

Jack Deaton     YES                Matt Phillips    NO                  Roger Hall       NO     

Bruce Wright   YES                Craig Hicks     NO                  Jerry King       YES

Harrie Farrow YES                Kellie Matt      YES                J. Howerton     NO

Hunter Rivett   NO                  F. Pedraza        NO

  1. November 21, 2023 – Temporary Moratorium on Industrial Wind – Sponsor JP Kellie Matt

An Ordinance establishing a Temporary Moratorium on the Construction of Industrial Wind and/or Solar Energy Facilities in Carroll County, AR

Summary: This one-year moratorium would have allowed the local community time to fully understand the consequences of wind/solar energy facilities on the surrounding locals

Jack Deaton     NO                  Matt Phillips    NO                  Roger Hall       NO

Bruce Wright   YES                Craig Hicks     NO                  Jerry King       NO

Harrie Farrow YES                Kellie Matt      YES                J. Howerton     NO

Hunter Rivett   NO                  F. Pedraza        NO

  1. January 16, 2024 – An Ordinance Adopting regulations concerning setback and construction of towers in Carroll County – Sponsor JP Jack Deaton

An Ordinance Adopting Certain Rules and Regulations Concerning Setback Lines and Construction of Towers in Carroll County and Within its Unincorporated Limits

Summary: Setbacks no closer than 1.5 times the height of the tower from non-participating landowner’s property line and not closer than 2 times the height from residential structures

Jack Deaton   YES                Matt Phillips    NO                  Roger Hall       Absent

Bruce Wright YES                Craig Hicks     NO                  Jerry King       YES

Harrie Farrow YES               Kellie Matt      Absent             J. Howerton     NO

Hunter Rivett NO                  F. Pedraza        YES

  1. February 20, 2024 – An Ordinance Adopting Setback Lines and Construction of Towers – Sponsor JP Kellie Matt

An Ordinance Adopting Certain Rules and Regulations Concerning Setback Lines and Construction of Towers in Carroll County and Within its Unincorporated Limits

Summary:  Setbacks shall be 3.5 times the height of the tower, or 2500 feet, whichever is greater from nonparticipating landowner’s property line or public road. Decommissioning was added.

Jack Deaton   NO                  Matt Phillips    NO                  Roger Hall       NO

Bruce Wright YES                Craig Hicks     NO                  Jerry King       NO

Harrie Farrow YES               Kellie Matt      YES                J. Howerton     NO

Hunter Rivett NO                  F. Pedraza        NO

  1. February 20, 2024 – An Ordinance Adopting Setback Lines and Construction of Towers – Sponsor JP John Howerton

An Ordinance Adopting Certain Rules and Regulations Concerning Setback Lines and Construction of Towers in Carroll County and Within its Unincorporated Limits

Summary: Setbacks shall be no closer than 1.14 times the height of the tower to nonparticipating landowner’s property line or 2 times from occupiable residential structures. Decommissioning was added.

Jack Deaton   YES                Matt Phillips    NO                  Roger Hall       NO

Bruce Wright YES                Craig Hicks     NO                  Jerry King       YES

Harrie Farrow YES               Kellie Matt      NO                  J. Howerton     YES

Hunter Rivett NO                 F. Pedraza        NO

  1. April 16, 2024 – Transparency Ordinance Sponsored by JP Harrow Farrow

An Ordinance Creating a Plan Submission Process for Large-Scale Industrial Projects in Carroll County*

Summary: This proposed Ordinance required prospective large-scale developer to provide information only regarding any planned industrial scale development, but did not require the developer to obtain any additional permits, to ensure that the Quorum Court would not be blindsided in the future

Jack Deaton   YES                Matt Phillips    Absent             Roger Hall       Absent

Bruce Wright YES                Craig Hicks     NO                  Jerry King       YES

Harrie Farrow YES               Kellie Matt      YES                J. Howerton     NO

Hunter Rivett Absent             F. Pedraza        Absent

*This Ordinance was resubmitted at June QC because of the high absentee rate at the April 2024 QC mtg.

  1. June 18, 2024 – Transparency Ordinance Sponsor JP Harrie Farrow

An Ordinance Creating a Plan Submission Process for Large-Scale Industrial Projects in Carroll County*

Summary: Same proposed Ordinance* from April QC mtg. Basically requiring transparency on the part of industrial scaled projects wanting to do business in Carroll County. This Ordinance ensured that the Quorum Court would not be blindsided in the future

Jack Deaton   NO                  Matt Phillips    NO                  Roger Hall       NO

Bruce Wright YES                Craig Hicks     NO                  Jerry King       NO

Harrie Farrow YES               Kellie Matt      YES                J. Howerton     NO

Hunter Rivett NO                  F. Pedraza        YES

*Resubmitted in June because of the high absentee rate at the April 2024 QC mtg. Two JPs flipped their vote in second reading voting against the transparency ordinance (Jack Deaton and Jerry King)

  1. March 18, 2025 – 5-Year Moratorium Sponsors JPs Kellie Matt and Jerry King

An Ordinance of the Quorum Court of Carroll County, Arkansas, Imposing a Temporary Moratorium on the Construction of Commercial Wind and Solar Energy Facilities for the Purpose of Commercial Marketing of Electricity

Summary: A 5-year moratorium on commercial wind and solar facilities in Carroll County. This five-year moratorium allows the local community time to fully understand the consequences of wind/solar energy facilities on the surrounding locals. Amended and Adopted after the 3rd reading in May 2025. At the first reading, JP King requested amendments to the 5-year moratorium to ensure wording that exempted Scout Clean Energy.

Jack Deaton   YES                Matt Phillips    Absent             Aron Hall        YES

Bruce Wright YES                Craig Hicks     YES                Jerry King       YES

Harrie Farrow YES              Kellie Matt      YES                C. Rogers        YES

Hunter Rivett YES                Bobby James   YES

Leave a Comment